The First UMC team decided to apply the final coat of paint to our renovated restrooms.
![]() |
Daniel and Andrea in action. |
| Kate mans the roller out in the hallway. | ![]() |
![]() |
Virginia hits the doorframe. |
| Tiffany rolls the other side of the wall. | ![]() |
![]() |
One exterior wall was sorely in need of paint. The team first scrapes away the old pint. |
| Fred, cleaning the exterior of the sanctuary with bleach water. This is something we do every summer in preparation for Harvest (August 13 this year). | ![]() |